Inspecciona modelos prerresueltos en tu navegador en 2 s (hasta 300k GDL) o resuelve ensamblajes pesados de más de 1,5M GDL 100% sin conexión en Windows, macOS y Linux.
Hoover Arch-Gravity Dam with Canyon Abutments
Monolithic mass-concrete arch-gravity dam model with stepped canyon abutments, crest spillway weirs, twin intake towers, and outlet tunnels under 18 MN reservoir thrust.
Hoover Dam on the Colorado River is the quintessential arch-gravity dam, transferring immense water thrust both vertically into the riverbed foundation and horizontally into the canyon rock walls through three-dimensional arching action. The structural geometry features a curved upstream face (R = 1,600 mm in scaled model), a variable trapezoidal cross-section thickening towards the base (from 180 mm crest to 620 mm base), stepped rock thrust blocks keyed into canyon abutments, 4 crest spillway bays with piers, twin upstream intake towers, and downstream outlet discharge tunnels. WebCAE evaluates 3D stress distributions under 18 MN hydrostatic thrust, verifying total reaction equilibrium within 0.31%.
1. Geometría y malla FEA
- •B-Rep geometry: curved arch-gravity concrete body (height 1,400 mm, radius 1,600 mm, base width 620 mm), downstream toe apron with twin outlet discharge tunnels (Ø 90 mm).
- •Abutment thrust blocks: 6 stepped lateral rock keying blocks along left (-X) and right (+X) canyon walls ensuring monolithic rock-concrete contact transfer.
- •Hydraulic structures: 2 upstream intake towers (Ø 130 mm, H = 1,450 mm) and 5 crest spillway piers forming 4 overflow weir bays.
- •Mesh discretization: 81,165 1st-order tetrahedral solid elements (TET4), 17,722 nodes, totaling 53,166 structural degrees of freedom in a single conforming continuum.
2. Cargas y condiciones de contorno
- •Fixed boundary constraints (u_x = u_y = u_z = 0) applied to the planar foundation base and all stepped left/right canyon abutment surfaces.
- •18.0 MN total upstream hydrostatic water thrust (+Y component) area-distributed across all upstream reservoir-facing cylindrical surfaces and intake tower shells.
- •Downstream and vertical water weight loads (-4.5 MN in -Z) plus crest roadway live load (-0.35 MN in -Z).
3. Resultados de simulación y conclusiones
- ✓Maximum horizontal arch crown deflection |u| = 3.06 mm at the crest center under full 18 MN water thrust, confirming high structural stiffness.
- ✓Peak localized von Mises stress σ_vm = 269.8 MPa located at the canyon abutment notch interfaces and spillway pier root transitions.
- ✓Total foundation reaction along the loading axis matches applied hydrostatic thrust within 0.31% relative equilibrium error (expectReaction gate passed).
WebCAE delivers high-fidelity 3D solid finite element analysis for massive hydraulic structures, arch dams, and spillway monoliths, computing hydrostatic thrust balance, stress concentrations, and foundation reactions directly in the browser.
14 días de acceso completo a Pro. El primer cobro se realiza tras 14 días salvo cancelación previa.
- ✓Prueba de 14 días ($0 hoy) (cancela cuando quieras)
- ✓Hasta 1,5M+ GDL (solucionador disperso directo)
- ✓Apps nativas para Windows, macOS y Linux (100% offline)
- ✓Contacto no lineal y pandeo (Kσ, MITC4, RBE2/RBE3)
Pregunta a un ingeniero sobre tu modelo
Describe tu pieza, caso de carga o formato CAD — responderemos en 2 horas laborables.
¿Quieres una respuesta instantánea sobre teoría FEA o este modelo?
Haz clic en el chat de IA en la esquina inferior derecha para consultar sobre condiciones de contorno, criterios de tensión, convergencia de malla o scripts DSL.