Cable-Net Tent Canopy · Inclined Tripod Mast · 1.2k DOFCivil & BridgesMITC4 Shells & Beams

Khan Shatyr Catenary Cable-Net Tent Structure

72 m inclined tripod tubular steel mast & Ø 110 m catenary radial-hoop cable-net tent canopy supported on a perimeter concrete compression ring wall.

Norman Foster's Khan Shatyr Entertainment Center in Astana is the world's largest tensile tent structure, rising 72 m on an inclined tripod steel mast to enclose a 110 m diameter microclimate under extreme continental weather (−40°C to +40°C). The structural scheme features an inclined three-legged tubular mast that supports a radial array of tensioned steel cables dropping down in catenary curves to a perimeter concrete compression ring beam, holding an ultra-lightweight three-layer ETFE cushion envelope. WebCAE evaluates mast leg compression, cable-net sag under extreme snow, membrane uplift, and vibration mode shapes.

✓ Inclined Tripod Mast Compression & Guys✓ Catenary ETFE Cable-Net Tension Canopy✓ Perimeter Compression Ring Beam✓ Non-Linear Geometric Sag & Wind Uplift
Pre-solved .caeweb container ready
Ø 110 m · H = 72 m · 405 beams · 192 quads · |u| = 136.2 mm · f₁ = 0.65 Hz · λ₁ = 0.27
Open in Web App (WASM) →
Opens directly on the Results tab in 2 seconds without re-solvingNeed 1.5M+ DOF offline? Get Pro ↓
Khan Shatyr Catenary Cable-Net Tent Structure
Ø 110 m · H = 72 m · 405 beams · 192 quads · |u| = 136.2 mm · f₁ = 0.65 Hz · λ₁ = 0.27Launch 3D ↗
Tent Diameter
Ø 110.0 m · Apex Height 72.0 m
Mast Structure
72 m inclined 3-legged tubular tripod
Catenary Cables
24 radial cables + 6 hoop rings
Membrane Quads
192 MITC4 quad elements (ETFE)
Degrees of Freedom
1,212 DOF
Max Canopy Sag
|u| = 136.2 mm (catenary bay)
Fundamental Frequency
f₁ = 0.65 Hz
Buckling Factor
λ₁ = 0.27 (local cable slack)

1. Geometry & FEA Mesh

  • •Geometry: 72 m apex elevation, elliptical footprint Ø 110 m at base, inclined tripod steel mast consisting of 3 legs (Ø 1.8 m) converging at the 72 m apex.
  • •Cable-net canopy: 24 radial catenary cables and 6 circumferential hoop cables (Ø 140–160 mm high-strength steel) integrated with 192 MITC4 membrane shell elements (t = 5 mm ETFE composite).
  • •Perimeter base ring: concrete ring beam at z = 8 m supported on 24 perimeter anchor columns resisting radial inward tension forces.
  • •Discretization: 229 nodes, 405 beam/cable members, 192 shell quads, 1,212 total system DOFs with verified cable-membrane tension compatibility.

2. Loads & Boundary Conditions

  • •Fixed base supports (all 6 DOFs constrained) at the 3 tripod mast footings and 24 perimeter compression ring columns (z = 0).
  • •Extreme continental snow loading and wind suction (-2.0 kPa pressure/suction) acting on the catenary membrane surface.
  • •Self-weight of tubular steel framing and tensile cable elements under pretension.

3. Simulation Results & Findings

  • ✓Maximum vertical static deflection |u| = 136.2 mm in the catenary mid-span cable bays under combined snow and self-weight.
  • ✓Fundamental mode frequency f₁ = 0.65 Hz corresponds to synchronous breathing and transverse swaying of the tensile cable net.
  • ✓Critical eigenvalue buckling load factor λ₁ = 0.27 reveals sensitive local cable slackening under asymmetric severe snow, highlighting the requirement for tension stiffening.
Enterprise & Engineering Workflow

WebCAE enables tensile architecture specialists to analyze large-span cable-net tents, ETFE structures, and tripod masts, predicting cable tensions, mast buckling loads, and dynamic response in browser-based workflows.

Launch Case in Web App →
14-Day Free Trial · $0 Due Today
$99/ mo (billed monthly after 14-day trial)

14 days of full Pro access. The first charge occurs only after 14 days unless canceled beforehand.

  • ✓14-Day Trial ($0 Today) (cancel anytime)
  • ✓Up to 1.5M+ DOFs (direct sparse solver)
  • ✓Native Windows & macOS Apps (100% offline)
  • ✓Nonlinear Contact & Buckling (Kσ, MITC4, RBE2/RBE3)

$0 due today. First charge occurs in 14 days unless cancelled. Cancel anytime in 1 click in your account.

Need bespoke solver development or a Dedicated Cloud VPS (128+ GB RAM, 32 cores)?
We build turnkey industry FEA pipelines and custom material models for engineering teams.

Ask an Engineer About Your Model

Describe your part, load case, or CAD format — we reply within 2 business hours.

WebCAE AI Assistant in bottom-right ↘

Want an instant answer on FEA theory or this model?

Click the AI chat button in the bottom-right corner to ask about boundary conditions, stress criteria, mesh convergence, or DSL scripting.

We use essential cookies to run this site, plus analytics cookies if you agree. Privacy Policy