Inspect pre-solved models in your browser in 2 seconds (up to 300k DOF) or solve 1.5M+ DOF assemblies 100% offline on Windows and macOS.
41-face B-Rep flanged steel pylon with 4 gusset ribs and mid-height stiffening ring discretized with curved 2nd-order TET10 elements under biaxial seismic base acceleration and eccentric RBE2 remote payload.
Telecom and power-grid pylons carrying heavy eccentric masthead equipment experience severe overturning moments and biaxial whiplash during seismic ground shock. This 41-face B-Rep model features a 220 × 220 × 25 mm anchor flange, 4 welded corner gussets, a mid-span stiffening ring at z = 500 mm, and a 160 × 160 × 30 mm top mounting flange. An eccentric equipment payload at (40, 40, 1220) mm (220 mm above the top face) is coupled to 45 top-flange slave nodes via an RBE2 spider while the foundation undergoes a biaxial seismic acceleration pulse a₀ = {35, 12, 0} m/s².
WebCAE couples quadratic TET10 solid meshes with RBE2 kinematic spiders and multi-axis base acceleration in nonlinear transient dynamics, enabling accurate seismic qualification of towers and equipment mounts.
14 days of full Pro access. The first charge occurs only after 14 days unless canceled beforehand.
Describe your part, load case, or CAD format — we reply within 2 business hours.
Click the AI chat button in the bottom-right corner to ask about boundary conditions, stress criteria, mesh convergence, or DSL scripting.
We use essential cookies to run this site, plus analytics cookies if you agree. Privacy Policy